Between audits

Bridge letters and the gap between SOC 2 audits: how to keep customers comfortable

What a bridge letter is, what it can and cannot say, how to handle the gap between report periods, and how to plan periods so customers never see a lapse.

11 min read · November 12, 2026 · By the Complianz team

Key takeaways
  • A SOC 2 report covers a past period. Between the end of that period and the next report, customers see a gap, and a bridge letter is the usual way to address it.
  • A bridge letter is a statement from your management, not from the auditor. It says whether anything has changed that would affect the controls since the period ended.
  • Plan report periods back to back, so the next period starts the day after the last one ends and the gap is small.
  • Never write a bridge letter you cannot support. If controls changed or failed, say so.

Why a gap exists

A SOC 2 Type 2 report describes how your controls operated over a defined period, for example the twelve months ending on a given date. By the time the auditor finishes fieldwork and issues the report, several weeks have often passed. If your report period ended on 31 December and the report arrives in February, a customer reading it in June is looking at information that stops six months ago.

Customers understand that a report cannot cover the future. What they want to know is whether anything significant has changed since the end of the period. The bridge letter, sometimes called a gap letter or comfort letter, is how you answer that question.

The concern is reasonable. A company could have a clean report and then change its hosting provider, lose its security lead or have an incident. A reviewer who sees only the report cannot tell. The letter gives a dated statement they can file with it.

What a bridge letter is

A bridge letter is a short document, usually one page, signed by an officer of your company. It refers to your most recent SOC 2 report and states, as of the date of the letter, that there have been no material changes to the system or the controls since the end of the report period, and that you are not aware of any events that would materially affect the conclusions in the report.

The important points are about who is speaking and what is being said.

  • It is from management. Your auditor does not issue it and does not test anything after the period ends. The signer is taking responsibility for the statements.
  • It is not an extension of the report. It does not add assurance. It documents management's representation.
  • It is dated. It covers the time up to the date of the letter, and a customer will treat a letter older than a few months with suspicion.
  • It refers to a specific report. It names the report, the auditor and the period.

Some auditors review a draft letter or provide a template, because they have seen what customers accept. Ask yours. They will not sign it, but their comments can save a round of revisions.

What to put in it

SectionWhat it says
ReferenceThe name of the report, the type (Type 2), the auditor and the period covered
Management statementThat management has considered whether changes occurred since the period end
No material changeThat there have been no material changes to the system or controls, or a description of any that occurred
No known eventsThat management is not aware of any incident or event that would materially affect the conclusions
Scope of the letterThat it is not a report from the auditor and does not extend their opinion
Date and signatureSigned by an officer, with a title and the date
DistributionProvided for the use of the customer named or for existing customers

Have your legal adviser review the wording once and keep a template. Writing it fresh each time invites inconsistency.

Making sure you can support what you sign

Before anyone signs, a short check should confirm that the statements are true. This takes less than an hour if you keep records.

  1. List changes since the period endNew or retired systems, major vendors, significant policy changes, organisational changes in security, new products that affect the in-scope service.
  2. Review your incident logConfirm there were no incidents that affect the conclusions.
  3. Review control statusCheck dashboards for failing controls since the period end. A control that failed last month is relevant.
  4. Confirm with control ownersA short email asking whether anything changed in their area.
  5. Record the checkSave the notes with the signed letter.

If you use a compliance platform that tracks control status daily, the third step is straightforward, because the history is already in one place.

Plan periods so the gap stays small

The better solution is to make the gap small enough that the letter is rarely needed. Observation periods for Type 2 reports can be chosen so they follow each other.

ApproachHow it worksEffect on the gap
Back-to-back annual periodsEach period starts the day after the last one endsNo uncovered time; the gap is only the reporting delay
Shorter first period, then annualA first Type 2 over three to six months, then twelve-month periodsGets a report sooner, then keeps continuity
A late start after a Type 1Type 1 first, then a Type 2 period begins afterA temporary gap in operating evidence
Gaps between periodsPeriod ends, next begins months laterCustomers see an uncovered stretch

Back-to-back periods keep your reports continuous, so a customer can line up the reports and see no break. Ask your auditor to plan the period dates with you at the start, and book the next engagement before the current one finishes.

Reporting delay is the remaining gap. If your period ends in December and fieldwork finishes in February, you will have a bridge period of a couple of months, which is easily handled with a letter dated near the time you send the report.

How customers react

Reviewers differ. Many accept a report issued within the last twelve months as current. Others want a period that ended within a stated time, such as the last year. Some contracts specify a bridge letter or an annual report as a condition.

  • Ask what your key customers require, and write it into your notes.
  • Offer the letter proactively when your report period ended more than a few months ago.
  • If your report is more than twelve months past its period end, expect additional questions. Explain when the next report is due.
  • If a customer wants a more recent assurance than the report, discuss a shorter period or interim evidence, such as a summary of your continuous control monitoring.

Do not argue with a reviewer about whether a letter is enough. Ask what they need and decide whether you can provide it.

When you only have a Type 1

A Type 1 report describes design at a single date. It is often a first step, and customers know it has limits. Between a Type 1 and a Type 2, you have a longer window with weaker assurance.

  • State plainly where you are: Type 1 issued on a date, Type 2 observation under way, expected report in a given month if your auditor agrees.
  • Provide supplementary information: policies, penetration test summary and a description of the controls running during the period.
  • Keep the observation period moving. Delays here extend the time customers must rely on a design-only report.

A bridge letter after a Type 1 is less meaningful, because the report said nothing about operation. Be careful that the wording does not suggest more assurance than exists.

Mistakes to avoid

  • Signing a letter without checking changes. The signer is making a representation.
  • Issuing one letter and reusing it for a year. Letters must be dated near the time of use.
  • Letting a period lapse. A gap of months with no coverage invites questions.
  • Implying the auditor stands behind the letter. They do not.
  • Writing a letter that goes beyond the report, such as claiming compliance with a different standard.
  • Forgetting to update the trust center and questionnaire answers with the new report dates.

A simple process to adopt

  1. Set the period dates with your auditorMake them continuous.
  2. Calendar the datesReport period end, expected report date and quarterly letter reviews.
  3. Keep a templateReviewed by legal, with fields for the report, period and date.
  4. Run the change check before each letterUse the short list above.
  5. Store letters with the reportIn the same place as the report, with the date sent and to whom.
  6. Update public pagesThe trust center should show the latest report period and whether a letter is available.

With this in place, a customer request for a bridge letter becomes a ten-minute task, not a scramble.

A sample letter structure

The wording below shows the shape of a typical letter. It is a structure to adapt with your legal adviser, not a template to send as it stands, and every bracketed item must be true when you sign.

  1. HeadingCompany letterhead, the date and the name of the recipient or 'To whom it may concern'.
  2. Opening'This letter relates to the SOC 2 Type 2 report on [system name] issued by [auditor] for the period [start] to [end].'
  3. Representation'Management has considered whether any changes have occurred since [end of period] that would materially affect the system or the controls described in the report.'
  4. Statement'Between [end of period] and the date of this letter, there have been no material changes to the system or its controls, and management is not aware of any events that would materially affect the conclusions in the report.' If there were changes, replace this with an accurate description.
  5. Limits'This letter is a representation of management. It is not a report of the independent auditor and does not extend the period covered by the report.'
  6. SignatureName and title of an officer, such as the chief executive or head of security.

Keep it to a page. Long letters with extra assurances raise more questions than they answer.

When something has changed

Honest letters sometimes contain news. That is acceptable and often reassuring if handled well. Changes fall into a few categories.

ChangeHow to describe itWhat the customer will probably ask
New cloud region or providerState what moved and when, and whether controls are the sameIs the new environment covered by the same controls and the next audit period?
Replaced a major tool, such as an identity providerState the date and that equivalent controls operateWere there any gaps in access control during the move?
Change in security leadershipState who now owns the programAre responsibilities clear, and is the program continuing as before?
Security incidentDescribe at a level appropriate to the incident and the steps takenWas customer data affected? What did you change?
Acquisition or reorganisationState the effect, if any, on the system in scopeDoes the new owner follow the same controls?

The key is to describe, not to minimise. A reviewer who sees a clearly explained change usually closes the question. One who suspects it was hidden does not.

A small evidence pack to send with the letter

When customers want more than the letter, a short pack of supporting information often settles the question. Assemble it once and refresh it each quarter.

  • A summary of control status over the last quarter, from your compliance tool, showing the share of controls passing and any open items.
  • The date of your most recent access review, restore test and tabletop exercise.
  • A summary of your latest penetration test, with the date and the status of findings.
  • The expected dates for your next audit period and report, if confirmed with your auditor.
  • A named contact for follow-up questions.

Make sure every item is accurate and dated. The pack is a communication tool, not an audit, and should be labelled that way.

Frequently asked questions

What is a SOC 2 bridge letter?

A statement from your management, dated and signed, saying whether anything material has changed since the end of the period covered by your latest report.

Does the auditor sign it?

No. It is management's representation. Some auditors will comment on a draft.

How long is a bridge letter valid?

It covers the time up to its date. Customers often expect a recent date, so reissue it when requested.

Can we send a bridge letter after a Type 1?

You can, but it adds little because a Type 1 does not test operation. Be careful not to overstate.

How do we avoid the gap altogether?

Plan back-to-back observation periods and book your auditor for the next period before the current one ends.

This article is general information, not legal or audit advice. Your auditor decides what satisfies a framework for your company. Complianz is software that helps you prepare; it does not issue reports or certificates, and using it does not guarantee a result.

Turn the playbook into a working program.

Create a free workspace, connect your first integration and see which controls already pass.